FRP Tanks for Petroleum Storage
Underground FRP tanks for petrol, diesel and fuel storage — hydrocarbon-resistant, non-corroding, and available in double-wall construction with interstitial leak monitoring.
Underground steel tanks corrode from soil, not just fuel
Underground mild steel tanks fail from external soil corrosion and stray current attack long before the steel itself wears from fuel contact — that's why cathodic protection is mandatory for steel. FRP tanks don't corrode from either direction, and eliminate that maintenance burden entirely.
Where FGPL petroleum storage tanks are already at work
Standard build specification
| Parameter | Specification |
|---|---|
| Construction | Single-wall or double-wall with interstitial monitoring space |
| Resin systems | Isophthalic polyester or Vinyl ester — hydrocarbon-compatible grades |
| Installation | Underground, engineered for soil and groundwater loading |
| Corrosion protection | Inherent — no cathodic protection system required |
| Design standards | IS 803, ASTM D4097; site-specific petroleum storage codes as applicable |
| Fittings | Fill point, vent, gauge, leak-monitoring ports — per site layout |
| Certification | ISO 9001:2015 manufacturing; test reports on request |
← swipe to see more →
FRP vs Mild Steel (bare) vs Coated Steel for underground fuel tanks
| Factor | FRP Tank | Mild Steel (bare) | Coated Steel + CP |
|---|---|---|---|
| Soil-side corrosion | None — inert | Severe | Managed, needs CP system |
| Cathodic protection needed | No | Yes, mandatory | Yes, mandatory |
| Leak detection | Double-wall option | Retrofit only | Retrofit only |
| Underground service life | 25–30+ years | 10–15 years | 15–20 years |
← swipe to see more →
Get an underground fuel tank built for your site
Share your capacity, fuel type, and single/double-wall requirement — FGPL's engineering team will recommend the right design within 24 business hours.
Frequently asked questions
Request a Quote for FRP Products
- Send your requirement
Product, size, quantity and where it's headed — a drawing helps, but isn't needed to start.
- We review and quote
Our engineers check feasibility, resin grade and lead time, then come back with a costed proposal.
- Manufacture and dispatch
Approved drawings go to our Indore plant, and we ship across 20 states and 10 countries.
- Response within 24 hours
- ISO certified manufacturing
- No obligation to order
