FRP Tanks for the Chemical Industry
Vinyl ester and isophthalic FRP tanks engineered for acids, alkalis, solvents and corrosive effluents — built to survive where mild steel and rubber-lined tanks fail early.
Chemical plants lose more to corrosion than to almost anything else
Acid dilution tanks, alkali storage, ETP feed tanks and solvent vessels made from mild steel corrode within a few years, and lined tanks fail the moment the lining delaminates. FRP tanks don't rust, pit, or need re-lining — the corrosion barrier is built into the laminate itself.
Where FGPL chemical tanks are already at work
Standard build specification
| Parameter | Specification |
|---|---|
| Capacity range | 500 L – 100,000+ L (vertical, horizontal & rectangular) |
| Resin systems | Isophthalic polyester (mild duty), Vinyl ester — bisphenol / novolac (severe duty) |
| Corrosion barrier | Resin-rich C-glass veil layer, 2–3 mm, integral to laminate |
| Operating temperature | Up to 90°C standard, higher on request with novolac vinyl ester |
| Design standards | IS 803, ASTM D4097, BS 4994 (on request) |
| Fittings | Nozzles, manways, level gauges, vents — customised to P&ID |
| Certification | ISO 9001:2015 manufacturing; test reports on request |
← swipe to see more →
FRP vs Mild Steel vs Lined Steel for chemical storage
| Factor | FRP Tank | Mild Steel (bare) | Rubber/PP-Lined Steel |
|---|---|---|---|
| Corrosion resistance | Excellent — inherent | Poor | Good, until lining fails |
| Maintenance | Minimal | Frequent repainting | Periodic re-lining |
| Weight | Light | Heavy | Heavy |
| Service life | 15–25+ years | 5–8 years | 8–12 years |
| Upfront cost | Moderate | Lower | Moderate–High |
← swipe to see more →
Get a tank built for your exact chemical duty
Share your chemical, concentration, temperature and capacity — FGPL's engineering team will recommend the right resin and design within 24 business hours.
Frequently asked questions
Request a Quote for FRP Products
- Send your requirement
Product, size, quantity and where it's headed — a drawing helps, but isn't needed to start.
- We review and quote
Our engineers check feasibility, resin grade and lead time, then come back with a costed proposal.
- Manufacture and dispatch
Approved drawings go to our Indore plant, and we ship across 20 states and 10 countries.
- Response within 24 hours
- ISO certified manufacturing
- No obligation to order
